Our solutions are -

  • Based on the philosophy of Appropriate Technology (Intermediate Technology).
  • Always aim at achieving a Golden Mean between a High Level Automation and Labor intensive work.
  • Based on Simplest Level of technology as far as possible, that can achieve the intended purpose.
  • Always environmentally sustainable and are not capital-intensive.

Production Planning and Control (PPC) System

Functional Modules

  • Real Time Monitoring and Reporting of -
    • 1. OEE (Overall Equipment Effectiveness)
    • 2. Operator Efficiency
    • 3. No. of components produced
    • 4. Rejection and rework on each machine/workstation
  • Manpower deployment and planning of daily production, set-up changes at start of every shift /day /week.
  • Real time WIP(Work In Progress) on machine shop – for each variety of component as per process sequence.

Key Features

  • No “EDGE “ Device required
  • Very low Fixed cost ( hardware cost).
  • Very less hardware elements in the system Architecture resulting into a lowest AMC cost.







Engineering Consultancy

  • Camshaft Process improvement
  • Improve bottom line of the organization using Six–Sigma methodology
  • Camshaft NPD (New Product Development)
  • Retrofitting of conventional wheel. CAM and journal grinding machine to use CBN wheel and to improve productivity.



IMPROVING CBN GRINDING WHEEL LIFE WHEEL BY SURFACE TEXTURE ANALYSIS USING IMAGE PROCESSING TECHNIQUE

  • Increased CBN Wheel life resulting into 30% reduction in grinding process cost
  • Image processing software analyzes wheel surface condition to decide optimum dressing frequency and dressing parameters.
  • Application is also very useful for getting maximum production per CBN wheel for lower cutting speeds Viz. 40 m/s to 70m/s.

First slide

Get in touch

For initial consultation, to book an appointment or to discuss your engineering solution needs, please contact us: